1.  >>  国家开放大学 / 理工英语3
 国家开放大学 / 理工英语3

题干

二、阅读理解:阅读下面的短文,根据文章内容进行判断,正确写“T”错误写“F”。


Amphibious Architecture: Flood-Proof Home Designs


    Instead of trying to beat back the rising flood, innovative amphibious buildings can adapt to the rising flood. These buildings are ready for whatever Mother Nature might throw at them– even 10-foot floodwaters. Let's take a look at just two of them.


The UK's First Amphibious House


   The UK's first amphibious house is located on the Thames River. And the first amphibious building in Britain will be completed soon. Baca Architects designed this home for a couple who wanted to live on a flood-prone island, an island easy to be attacked by floods, in the Thames River. This building is equipped with a terraced landscape. And this terraced landscape acts as an early warning system when the waters are rising. The terraces will be filled with water before the ‘wet dock’ under the house does, and then the home itself will slowly rise to stay above the water.


Solar Powered Floating School in Nigeria


   Residents of Makoko in Nigeria have been building houses on stilts for generations. People there go from one house to another by canoe. As sea levels are rising, officials threaten to tear down the entire community. If these houses are tore down, 250,000 people will be homeless and have to look for a new place to live. Architects found a solution in floating structures with improved sanitation conditions. The first completed example is a three-storey solar-powered school.


    This amazing floating school addresses social, physical and ecological needs. Built on top of 256 recycled blue barrels, the school buildings are made of triangular bamboo and wood. Makoko's residents made full use of their skills when building these structures. With three levels, the solar-powered high school has room for 100 local kids and recycles rainwater to flush the toilets. And the cost for the whole school structures was under $7,000.


 


1.Innovative amphibious buildings have adaptation to the rising flood.  

正确
获得3.00分中的3.00分


2.The first amphibious building in Britain has been completed.  

正确
获得3.00分中的3.00分


3.250,000 residents of Makoko in Nigeria will be homeless if officials tear down their houses.  

正确
获得3.00分中的3.00分


4.The first completed floating school has three floors.   

正确
获得3.00分中的3.00分


5.In the opinion of the writer, the cost for the floating school was quite high.   

正确
获得3.00分中的3.00分

  积分
 参考答案:
 佳题速递:
  • 下列关于我国发电厂上网电价的描述,不正确的是:电力市场
  • 下面属于Server 对象的方法的是( )。互联网软件应用与开发(网络程序设计)
  • 无节奏流水施工的特点中不包括(  )。a. 各施工过程的流水节拍不相等,且无规律b. 所有施工过程在各施工段上的流水节拍均相等 c. 流水步距一般不相等d. 专业队数目等于施工过程数目建筑工程项目管理
  • 10年期10%利率的普通年金终值系数为15.937,那么在期限和利率相同情况下的预付年金终值系数为( )A.13.453B.18.215C.16.365D.17.531公司财务
  • 领导归因理论认为,重要的是展示有效领导者的实际成就,而不是关注外在形象 组织行为学
  • 能够感受湿度的电容式传感器属于变( )的电容传感器。测试技术