分享 指将风险的责任分配给最能为项目之利益获取机会的第三方,包括建立风险风险合作关系,或专门为机会管理目的形成的团队,特殊目的的项目公司或合作企业。



  积分
 参考答案:
 佳题速递:
  • 92、计算机系统由______两大部分组成。 A.硬件系统和软件系统 B.主机和外部设备 C.系统软件和应用软件 D.输入设备和输出设备计算机统考
  • 39、“Cool” is a word with many meanings. Its old meaning is used to express a temperature that is a little bit cold. As the world has changed, the word has had many different meanings. “Cool” can be used to convey feelings of interest in almost anything. When you see a famous car in the street, maybe you will say, “It's cool.” You may think, “He's so cool.”when you see your favorite football player. We all maximize(最大化) the meaning of “Cool”. You can use it instead of many words such as “new” or “surprising”. Here's an interesting story we can use to show the way the word is used. A teacher asked her students to write about the waterfall they had visited. On one student's paper was just one sentence, “It's cool.”Maybe he thought it was the best way to show what he saw and how he felt. But the story also shows a scarcity of words. Without “Cool”, some people have no words to show the same meaning. So it is quite important to keep some credibility(可信性). Can you think of many other words that make your life as colorful as the word “Cool”? I can. And I think they are also very cool.统考英语阅读理解
  • G—W ……P……W′-G′是( ) (A)货币资本的循环公式(B)生产资本的循环公式(C)商品资本的循环公式(D)商业资本的循环公式[参考答案:A]  分值:2得分: 分 系统自动批改于2020年12月23日 22点31分 政治经济学
  • (15)Companies need to protect themselves against a host of criminals worldwide like thieves, hackers and virus makers.正确错误电子商务英语
  • 高等数学2
  • (注意:每位同学只能发表一个帖子,该贴将被计分) 【案例一】 1.某工程在施工招标文件中规定:本工程有预付款,数额为合同价款的10%,在合同签署并生效后7日内支付,当进度款支付达到合同总价的60%时一次性全额扣回,工程进度款按季度支付。 某承包商准备对该项目投标,根据图纸计算,报价为9000万元,总工期为24个月,其中:基础工程估价为1200万元,工期为6个月;上部结构工程估价为4800万元,工期为12个月;装饰和安装工程估价为3000万元,工期为6个月。 该承包商为了既不影响中标,又能在中标后取得较好的收益,决定采用不平衡报价法对原报价做适当调整,基础工程调整为1300万元,上部结构工程调整为5000万元,装饰和安装工程调整为2700万元。 另外,该承包商还考虑到,该工程虽然有预付款,但平时工程款按季度支付不利于资金周转,决定除按上述调整后的数额报价外,还建议业主将支付条件改为:预付款为合同价的5%,工程款按月支付,其余条款不变。 【问题】 (1)该承包商所采用的不平衡报价法是否恰当?为什么? (2)除了不平衡报价法,该承包商还运用了哪一种报价技巧?是否恰当?为什么?工程招投标概论